Game Info

Power Grid: Québec/Baden-Württemberg
2 - 6 players
average 120 minutes
Advanced
Published in
View Global Stats
View on boardgamegeek.com View on boardgamegeek.com
Economic Industry / Manufacturing Expansion for Base-game
Auction/Bidding Route/Network Building

The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW. In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will remain until purchased by a player or removed when the number on it is lower than the number of cities power by any player. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks. In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may be connected only starting in »step 2«. Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts. Incorporates maps from: Mégawatts Funkenschlag: EnBW

Overall Statistics for RoMa

Total Games Played: 0
Average Players Per Game 0

Win/Loss Statistics for RoMa

Badges Name   NemePoints   Total Games   Avg. NemePoints   Wins / Losses % Won  

    Last 0 Played Games for RoMa

    Date Played Result